Major projects 2019

In 2018 BP started up six upstream major projects in Europe and Eurasia, North Africa and North America, following on from seven successful start-ups in 2017.? Together with the projects already brought on line in 2016 these new projects will make a huge contribution to the 900,000 barrels of oil equivalent per day (mboed) of new production, net to BP by 2021
Major projects 2019

Culzean, UK - North Sea

~30 mboed peak annual average production, net to BP

?

Culzean is a 1.2 Tcf High Pressure High Temperature (HPHT) lean gas condensate field located approximately 140 miles east of Aberdeen in Block 22/25a of the Central North Sea in water depths of 300 feet. The project scope includes a stand-alone three bridge-linked platform development with dry gas export via the Central Area Transmission System (CATS) and liquids export via a new-build Floating Storage and Offloading tanker (FSO).?

?

Completed : 11 June 2019?

Culzean, UK - North Sea
Angelin, Trinidad

Angelin,?Trinidad

~50 mboed peak annual average production, net to BP
?

The Angelin project develops four wells and features the construction of a new platform 40 miles off the southeast coast of Trinidad in water-depth of approximately 215 feet. Gas from Angelin flows to the Serrette platform hub via a new 13-mile pipeline.

?

Completed : 26 February 2019

West Nile Delta - Giza / Fayoum

~50?mboed?peak annual average production, net to BP

West Nile Delta - Giza / Fayoum is the second stage of the West Nile Delta five-field development (following startup of Taurus / Libra?in 2017) from two BP-operated offshore?concession blocks, North Alexandria and West Mediterranean Deepwater.

?

Completed: 2 February 2019

West Nile Delta – Giza / Fayoum, Egypt
Constellation, US - Gulf of Mexico

Constellation,?US - Gulf of Mexico

~10 mboed peak annual average production, net to BP

?

Constellation is a Pliocene discovery located in central Green Canyon. Production from Constellation is tied-back to Anadarko’s Constitution spar in approximately 5,000 feet of water.

?

Completed: January 27 2019

West Nile Delta - Raven, Egypt

~130 mboed peak annual average production, net to BP

?

Raven is the third phase of the West Nile Delta development (following Taurus / Libra and Giza / Fayoum) from two BP-operated offshore concession blocks, North Alexandria and West Mediterranean Deepwater. The Raven project includes 8 wells and will be developed as a deepwater long distance tie back to shore, where the new Raven onshore plant is being built, immediately adjacent to the Giza / Fayoum facilities.

?

Status: On track?

West Nile Delta - Raven, Egypt
成 人影片 免费观看10分钟_成 人影片 免费观看10分钟加勒比久在线dvd_日本在线加勒比成 人影片 免费观看10分钟 一道本免费无码高清dvd-一道本成 人影片 免费观看10分钟无码-一道久高清免费无码 2018成 人影片 免费观看10分钟,天天干,天天操,天天射,天天好逼网,成 人影片 免费观看10分钟网 一级成 人影片 免费观看10分钟影片 夫妻性生活影片 免费成 人影片 免费观看10分钟 成 人影片 免费观看10分钟 久久夜视频成 人影片 免费观看10分钟3线视频成 人影片 免费观看10分钟,久久干视频成 人影片 免费观看10分钟36线视频成 人影片 免费观看10分钟,久久免费福利频频在线看6 成 人影片 免费观看10分钟_美女成 人影片 免费观看10分钟网站免费日本无码不卡成 人影片 免费观看10分钟 日本无码不卡成 人影片 免费观看10分钟 -日本阿v片在线成 人影片 免费观看10分钟-日本毛片高清成 人影片 免费观看10分钟 日本黄大片成 人影片 免费观看10分钟-日本阿v片在线成 人影片 免费观看10分钟_日本一级特黄大片