成 人影片 成 人影片 免费观看10分钟10分钟

  1. Home
  2. Investors
  3. Upstream major projects
  4. 2018 Upstream major projects
  5. Atoll Phase 1, Egypt

Atoll Phase 1, Egypt

Completed: 2 December 2017

~45 mboed peak annual average production, net to BP
Atoll Phase 1, Egypt
“BP is focused on delivering growth with discipline, carefully choosing and efficiently executing high-quality projects. The longstanding partnerships we have in Egypt allowed us to fast-track Atoll’s development and deliver first gas only 33 months after discovery. This is a further demonstration of our commitment to help realise Egypt’s oil and gas potential and meet the increasing demand from its growing population.”
?

Bob Dudley, BP group chief executive

BP announced the Atoll discovery in March 2015. The main reservoir in the field contains an estimated 1.5 trillion cubic feet of gas and 31 million barrels of condensates, and further segments are under evaluation.

The Atoll Phase 1 project is an early production scheme involving the recompletion of an existing exploration well as a producing well, the drilling of two additional wells, the installation of the necessary subsea infrastructure, and upgrading of existing onshore facilities required to produce from the field.

The Atoll project was delivered 33 months after discovery, with test production starting on 2 December 2017, seven months ahead of the original plan. The project will produce up to 350 million standard cubic feet a day (mmscfd) gas and 10,000 barrels per day (bpd) condensate, which will be processed at the West Harbour facilities and fed into Egypt's national grid.

Location  Egypt
Operator Pharaonic Petroleum Company (PhPC)
Partners BP (100%)
Project type Conventional gas
Peak annual average production
~65 mboed(gross)
~45 mboed (net)
Atoll Phase 1, Egypt

Atoll’s exploration well reached 6400 metres in depth in 2015. That’s drilling further than the height of Mount Kilimanjaro (5,895 metres).

Atoll Phase 1, Egypt

成 人影片 免费观看10分钟Atoll’s wells on the seabed connect to new and existing production facilities. That subsea tieback is BP’s longest on record at 110 kilometres, almost as far as the distance between the Egyptian cities of Cairo and Suez.

Atoll Phase 1, Egypt

The Atoll project was delivered 33 months from discovery and seven months ahead of original plan.

Gallery

Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
成 人影片 免费观看10分钟_成 人影片 免费观看10分钟加勒比久在线dvd_日本在线加勒比成 人影片 免费观看10分钟 一道本免费无码高清dvd-一道本成 人影片 免费观看10分钟无码-一道久高清免费无码 2018成 人影片 免费观看10分钟,天天干,天天操,天天射,天天好逼网,成 人影片 免费观看10分钟网 一级成 人影片 免费观看10分钟影片 夫妻性生活影片 免费成 人影片 免费观看10分钟 成 人影片 免费观看10分钟 久久夜视频成 人影片 免费观看10分钟3线视频成 人影片 免费观看10分钟,久久干视频成 人影片 免费观看10分钟36线视频成 人影片 免费观看10分钟,久久免费福利频频在线看6 成 人影片 免费观看10分钟_美女成 人影片 免费观看10分钟网站免费日本无码不卡成 人影片 免费观看10分钟 日本无码不卡成 人影片 免费观看10分钟 -日本阿v片在线成 人影片 免费观看10分钟-日本毛片高清成 人影片 免费观看10分钟 日本黄大片成 人影片 免费观看10分钟-日本阿v片在线成 人影片 免费观看10分钟_日本一级特黄大片