West Nile Delta – Taurus / Libra, Egypt

Completed: 24 Mar 2017

80 mboed peak annual average production, net to BP
“West Nile Delta is a strategic national project that will add significant gas production to the Egyptian market and is another example of BP’s commitment to Egypt. Our continuing investments in the country, including West Nile Delta, Atoll and our recent investment in Zohr, are laying the foundations for growth for BP in Egypt well into the future."
?

Bob Dudley, BP's group chief executive

The WND development consists of five gas fields across two BP-operated offshore concession blocks, North Alexandria and West Mediterranean Deepwater.? Production from the five fields is expected to reach up to 1.3 billion cubic feet a day (bcf/d), equivalent to about 30 per cent of Egypt’s current gas production. All the produced gas will be fed into the national gas grid.

?

The West Nile Delta development has been executed as two major projects enabling BP to accelerate its gas production commitment to Egypt. The Taurus and Libra project is a subsea greenfield development with nine wells (six in Taurus and three in Libra) and a 42 km tie back. Gas will be processed at an existing onshore processing facility and will enter into the Egyptian national gas grid via a nearby export pipeline.

?

Production started on the 24 March 2017 from Taurus and Libra, which were fast-tracked to add up to 600 mmscfd daily to the Egyptian national gas grid.

?

Giza, Fayoum and Raven are the remaining three fields of the West Nile Delta development. The project includes fifteen wells and two deep-water long distance subsea tie-backs to the shore.? Fluids will be processed through an onshore plant modified for Giza Fayoum and integrated with a new adjacent onshore plant for Raven. First gas from Giza / Fayoum is expected in 2018, followed by Raven in 2019.

Location Egypt
Operator BP
Partners BP (82.75%), RWE Dea (17.25%)
Project type Conventional gas
Peak annual average production
~ 105 mboed (gross)
~ 80 mboed ( (net)
West Nile Delta – Giza / Fayoum, Egypt

West Nile Delta – Giza / Fayoum, Egypt

West Nile Delta – Giza / Fayoum, Egypt

West Nile Delta – Giza / Fayoum, Egypt

West Nile Delta – Giza / Fayoum, Egypt

Gallery

Structure loadout
Suction cans
Installation Operations
Structure loadout
Suction cans
Installation Operations
A new energy era for Egypt

A new energy era for Egypt

Egypt is looking ahead to new opportunities to revive domestic energy production. BP Magazine visits the country to find out more

成 人影片 免费观看10分钟_成 人影片 免费观看10分钟加勒比久在线dvd_日本在线加勒比成 人影片 免费观看10分钟 一道本免费无码高清dvd-一道本成 人影片 免费观看10分钟无码-一道久高清免费无码 2018成 人影片 免费观看10分钟,天天干,天天操,天天射,天天好逼网,成 人影片 免费观看10分钟网 一级成 人影片 免费观看10分钟影片 夫妻性生活影片 免费成 人影片 免费观看10分钟 成 人影片 免费观看10分钟 久久夜视频成 人影片 免费观看10分钟3线视频成 人影片 免费观看10分钟,久久干视频成 人影片 免费观看10分钟36线视频成 人影片 免费观看10分钟,久久免费福利频频在线看6 成 人影片 免费观看10分钟_美女成 人影片 免费观看10分钟网站免费日本无码不卡成 人影片 免费观看10分钟 日本无码不卡成 人影片 免费观看10分钟 -日本阿v片在线成 人影片 免费观看10分钟-日本毛片高清成 人影片 免费观看10分钟 日本黄大片成 人影片 免费观看10分钟-日本阿v片在线成 人影片 免费观看10分钟_日本一级特黄大片