成 人影片 成 人影片 免费观看10分钟10分钟

  1. Home
  2. Careers
  3. Students and graduates
  4. Locations
  5. Oman

Oman

BP has a long history of oil and gas exploration and production in the Middle East
Our main office is located in Madinat Qaboos, a vibrant locality close to the coast of Muscat where employees can enjoy a wide range of facilities including an opera house, theatre and a cinema. The office has a modern design with an open plan structure. Employees can enjoy free lunch and have access to an on-site clinic.

Opportunities

成 人影片 免费观看10分钟Search and apply for our programmes

BP has a long history of oil and gas exploration and production in the Middle East. It is a major investor in Oman and one of the world’s pioneers in tight gas production, bringing technology and experience to develop one of the Middle East’s largest unconventional gas resources – the Khazzan field in Block 61.

?

In late September 2017, BP started production from Phase One of the Khazzan gas field. Phase One of Khazzan is made up of 200 wells feeding into a two-train central processing facility, with production reaching one-billion cubic feet of gas per day (bcf/d). Once the second phase of the Khazzan is fully up and running in 2021, production is expected to rise to 1.5 bcf/d. Approximately 300 wells are expected to be drilled over the estimated lifetime of the Khazzan field. Our people who are at the heart of everything we do will help us achieve that.

成 人影片 免费观看10分钟_成 人影片 免费观看10分钟加勒比久在线dvd_日本在线加勒比成 人影片 免费观看10分钟 一道本免费无码高清dvd-一道本成 人影片 免费观看10分钟无码-一道久高清免费无码 2018成 人影片 免费观看10分钟,天天干,天天操,天天射,天天好逼网,成 人影片 免费观看10分钟网 一级成 人影片 免费观看10分钟影片 夫妻性生活影片 免费成 人影片 免费观看10分钟 成 人影片 免费观看10分钟 久久夜视频成 人影片 免费观看10分钟3线视频成 人影片 免费观看10分钟,久久干视频成 人影片 免费观看10分钟36线视频成 人影片 免费观看10分钟,久久免费福利频频在线看6 成 人影片 免费观看10分钟_美女成 人影片 免费观看10分钟网站免费日本无码不卡成 人影片 免费观看10分钟 日本无码不卡成 人影片 免费观看10分钟 -日本阿v片在线成 人影片 免费观看10分钟-日本毛片高清成 人影片 免费观看10分钟 日本黄大片成 人影片 免费观看10分钟-日本阿v片在线成 人影片 免费观看10分钟_日本一级特黄大片